top of page
This project involved the removal of existing concrete street crossings at Child’s Street and the installation of new full-depth Star Track concrete tube crossings.
A total of 271 track feet of crossing was constructed, improving durability, structural integrity, and overall safety of the crossing infrastructure.

bottom of page

